Development Services

Capital Projects

Projects Out to Bid

Plans and specifications may be downloaded (PDF format) at no-cost by clicking the respective link(s) below. Printed copies of the plans and specifications may also be purchased by written request to, or in-person at, the Office of the City Engineer. Contact information is shown to the right. Any applicable shipping charges are in addition to the stated cost. Payment for printed plans and specifications are non-refundable; check or cash only.

Contractors -- Race Neutral Measure Opportunities

The California Department of Transportation is offering, through the California Construction Contracting Program (CCCP), free training, counseling, and resources in order to assist small businesses to successfully bid and win Caltrans and Local agency construction contracts.

The website address for the CCCP is www.buildcalifornia.org

The work consists, in general, of: Mobilization, implementation of traffic control plan, remove existing improvements, remove and salvage existing improvements, installation of waterline main pipes, service lines, installation of fire hydrants, earthwork, aggregate base, hot mix asphalt, minor concrete, traffic striping and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place.

City Project Number: 12-19
Bids Open: 6/19/2012 2:00 PM
Engineer's Estimate: $207,000.00
Contractor License Required: A-General Engineering Contractor C 34-Pipeline Contractor
Cost of Plans and Specifications: $30.00
Technical Contact: Alfonso Zepeda

View planholders list

Download plans and specifications
Print this project


The purpose of this Request for Proposals is to invite responses from qualified individuals or firms with professional experience in accessibility compliance that can assist City staff in the self-evaluation of all relevant public facilities, programs, services, and activities, as well as develop a transition plan, to include relevant monitoring and management tools, for keeping in compliance with the Americans with Disabilities Act (ADA) and other relevant laws and regulations. See the RFP (Specifications) for more information. There are no "Plans" associated with this project; only the RFP as listed under "Specifications." A pre-proposal conference was held at City Hall on 5/2/12 at 11:00 a.m. (attendance optional). Addendum No. 1 was issued on 5/2/12.

City Project Number: 11-27
Bids Open: 5/25/2012 5:00 PM
Engineer's Estimate: $140,000.00
Contractor License Required: ADA
Cost of Plans and Specifications: $0.00
Technical Contact: Eric Picciano, P.E.

Addenda:
Addendum No. 1 (179.9 KB)

View planholders list

Download specifications
Print this project


The project consists of components: 1. Headworks (Fine Screens and Screening Washer/Compactors) 2. Influent Pump Station No. 3 3. Yard Structures 4. Aeration Basins No. 6 and No. 7 5. Blower Building No. 2 6. Modifications to Primary Flotators No. 1 and No. 2 7. Aluminum Flat Truss Supported Cover over Equalization Basin No. 1 8. Replacement of Digester No. 4 Cover 9. Electrical Building No. 6 10. Electrical Building No. 7 11. Primary Electrical Service Switch Gear Modifications 12. Medium Voltage Electrical Distribution System and Ductbanks 13. Standby Power Generator 14. Additions and modifications to yard piping system 15. Additions and modifications to electrical systems 16. Additions and modifications to instrumentation systems 17. Additions and modifications to grading, paving and drainage system 18. Repair and reconstruction to existing improvements affected by the work and all work necessary to render the facility complete and operational. 19. Fine Bubble Membrane Diffuser Replacement: Aeration Basins No. 1 through No. 5 (Alternative Bid –A) Cost for printed contract documents are as follows (mailing not included): $400 - Full-size drawings (22” x 34”) and specifications (8.5" x 11"). $180 - Reduced-size drawings (11” x 17”) and specifications (8.5" x 11"). For procedural questions contact: Stephen Fremming City of Turlock, Development Services, Engineering Division (209) 668-5599 ext. 4417 sfremming@turlock.ca.us Submit all technical questions during the bid period in writing (via email only) to both the primary and secondary contacts listed below: Jean-Marc Petit, P.E. (primary contact) Carollo Engineers, Inc. – Walnut Creek, California Office 925-932-1710 jmpetit@carollo.com James Wickstrom, P.E. (secondary contact) Carollo Engineers, Inc. – Walnut Creek, California Office (925) 932-1710, jwickstrom@carollo.com A pre-Bid conference will be held at 10:00 am on Thursday, March 15, 2012 at Turlock Regional Water Quality Control Facility Administration Building, 901 South Walnut Road, Turlock, CA. Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are required to attend the conference. ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions arising at the conference. Bidders' attendance is MANDATORY in order to be considered for award of the contract.

City Project Number: 0751
Bids Open: 5/3/2012 2:00 PM
Engineer's Estimate: $27,800,000.00
Contractor License Required: A
Cost of Plans and Specifications: $400.00
Technical Contact: See project description

Apparent Low Bidder: C. Overaa & Co.
Council Award Date: 6/12/2012

Addenda:
Download Geotechnical Reports (36512.1 KB)
Addendum No. 1 (4505.5 KB)
Addendum No. 2 (138.6 KB)
Addendum No. 3 (12150.1 KB)
Addendum No. 4 (761.3 KB)
Addendum No. 5 (369.1 KB)

View planholders list
Bidder's Summary (649 KB)

Download plans and specifications
Print this project


The work consists, in general, of: clearing and grubbing, removing existing facilities, relocating a wood-framed stucco-finished fence, earthwork, grinding, constructing curb, gutter, and sidewalk, placing hot mix asphalt, installing storm drain catch basins and storm drain pipe.

City Project Number: 11-46
Bids Open: 4/18/2012 2:00 PM
Engineer's Estimate: $162,000.00
Contractor License Required: A
Cost of Plans and Specifications: $55.00
Technical Contact: Nathan Bray, PE

Apparent Low Bidder: Taylor Backhoe Services, Inc.
Council Award Date: 5/8/2012

View planholders list
Bidder's Summary (55 KB)

Download plans and specifications
Print this project


The project consists of the following: 1) Junction Structure 2) 48” Pump Station Influent Gravity Pipeline 3) Pump Station. (Cast in place wetwell, four vertical turbine pumps, prefabricated metal building, site work, and all other appurtenances). 4) Outfall Pipeline. (Approximately Steel Pipe or Ductile Iron Pipe - nominal diameter 36”). 5) Standpipe 6) 48” Gravity Pipeline to Outfall Structure 7) San Joaquin River Outfall Structure Bidders are required to complete Document 00451, Construction Contractor's Qualification Statement, attached to the Bid Form. For procedural questions contact: Stephen Fremming City of Turlock, Development Services, Engineering Division (209) 668-5599 ext. 4417 SFremming@turlock.ca.us Submit all technical questions during the bid period in writing (via email) to the first and second contacts listed below: Darren Baune (first contact) Carollo Engineers, P.C. – Walnut Creek Office (925) 932-1710, fax (925) 930-0203 dbaune@carollo.com Michael Hartlaub, (second contact) Carollo Engineers, P.C. – Walnut Creek Office (925) 932-1710, fax (925) 930-0203 mhartlaub@carollo.com The Contract Documents Consist of 4 volumes: Volume 1 - Drawings Volume 2 - Specifications (Divisions 0 through 9) Volume 3 - Specifications (Divisions 10 through 17) Volume 4 - Permits Volumes 2, 3, and 4 are combined into a single PDF file if downloaded from the City's website. These volumes are bounded separately if hard copies are purchased. A MANDATORY pre-Bid conference will be held at 10:00 am on January 11, 2012 at Turlock Regional Water Quality Control Facility Administration Building, 901 South Walnut Road, Turlock, CA.

City Project Number: 6859
Bids Open: 2/23/2012 2:00 PM
Engineer's Estimate: $20,800,000.00
Contractor License Required: A
Cost of Plans and Specifications: $135.00
Technical Contact: See project description for contact instructions

Apparent Low Bidder: Sierra Mountain Construction, Inc.
Council Award Date: 3/27/2012

Addenda:
Addendum 1 (289.6 KB)
Download Geotechnical Report (5009.2 KB)
Addendum 2 (807.2 KB)
Download Mandatory pre-bid sign in sheet and meeting presentation (5800.2 KB)
Addendum 3 (2623.3 KB)
Addendum 4 (1322.6 KB)
Addendum 5 (44.9 KB)
Addendum 6 (3156.3 KB)
Addendum 7 (2149.5 KB)
Addendum 8 (145.9 KB)

View planholders list
Bidder's Summary (303 KB)

Download plans and specifications
Print this project




Capital Projects
Contact Us
Engineering Division
156 S Broadway, Suite #150
Turlock, CA 95380
(209) 668-5520
engineering@turlock.ca.us