Plans and specifications may be downloaded (PDF format) at no-cost by clicking the respective link(s) below. Printed copies of the plans and specifications may also be purchased by written request to, or in-person at, the Office of the City Engineer. Contact information is shown to the right. Any applicable shipping charges are in addition to the stated cost. Payment for printed plans and specifications are non-refundable; check or cash only.
Contractors -- Race Neutral Measure Opportunities
The California Department of Transportation is offering, through the California Construction Contracting Program (CCCP), free training, counseling, and resources in order to assist small businesses to successfully bid and win Caltrans and Local agency construction contracts.
The work consists, in general, of: Mobilization, implementation of traffic control plan, remove existing improvements, remove and salvage existing improvements, installation of waterline main pipes, service lines, installation of fire hydrants, earthwork, aggregate base, hot mix asphalt, minor concrete, traffic striping and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place.
City Project Number: 12-19 Bids Open: 6/19/2012 2:00 PM Engineer's Estimate: $207,000.00 Contractor License Required: A-General Engineering Contractor
C 34-Pipeline Contractor Cost of Plans and Specifications: $30.00 Technical Contact: Alfonso Zepeda
The purpose of this Request for Proposals is to invite responses from qualified individuals or firms with professional experience in accessibility compliance that can assist City staff in the self-evaluation of all relevant public facilities, programs, services, and activities, as well as develop a transition plan, to include relevant monitoring and management tools, for keeping in compliance with the Americans with Disabilities Act (ADA) and other relevant laws and regulations. See the RFP (Specifications) for more information. There are no "Plans" associated with this project; only the RFP as listed under "Specifications." A pre-proposal conference was held at City Hall on 5/2/12 at 11:00 a.m. (attendance optional). Addendum No. 1 was issued on 5/2/12.
City Project Number: 11-27 Bids Open: 5/25/2012 5:00 PM Engineer's Estimate: $140,000.00 Contractor License Required: ADA Cost of Plans and Specifications: $0.00 Technical Contact: Eric Picciano, P.E.
The project consists of components:
1. Headworks (Fine Screens and Screening Washer/Compactors)
2. Influent Pump Station No. 3
3. Yard Structures
4. Aeration Basins No. 6 and No. 7
5. Blower Building No. 2
6. Modifications to Primary Flotators No. 1 and No. 2
7. Aluminum Flat Truss Supported Cover over Equalization Basin No. 1
8. Replacement of Digester No. 4 Cover
9. Electrical Building No. 6
10. Electrical Building No. 7
11. Primary Electrical Service Switch Gear Modifications
12. Medium Voltage Electrical Distribution System and Ductbanks
13. Standby Power Generator
14. Additions and modifications to yard piping system
15. Additions and modifications to electrical systems
16. Additions and modifications to instrumentation systems
17. Additions and modifications to grading, paving and drainage system
18. Repair and reconstruction to existing improvements affected by the work and all work necessary to render the facility complete and operational.
19. Fine Bubble Membrane Diffuser Replacement: Aeration Basins No. 1 through No. 5 (Alternative Bid –A)
Cost for printed contract documents are as follows (mailing not included):
$400 - Full-size drawings (22” x 34”) and specifications (8.5" x 11").
$180 - Reduced-size drawings (11” x 17”) and
specifications (8.5" x 11").
For procedural questions contact:
Stephen Fremming
City of Turlock, Development Services, Engineering Division
(209) 668-5599 ext. 4417
sfremming@turlock.ca.us
Submit all technical questions during the bid period in writing (via email only) to both the primary and secondary contacts listed below:
Jean-Marc Petit, P.E. (primary contact)
Carollo Engineers, Inc. – Walnut Creek, California Office
925-932-1710
jmpetit@carollo.com
James Wickstrom, P.E. (secondary contact)
Carollo Engineers, Inc. – Walnut Creek, California Office
(925) 932-1710,
jwickstrom@carollo.com
A pre-Bid conference will be held at 10:00 am on Thursday, March 15, 2012 at Turlock Regional Water Quality Control Facility Administration Building, 901 South Walnut Road, Turlock, CA. Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are required to attend the conference. ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions arising at the conference. Bidders' attendance is MANDATORY in order to be considered for award of the contract.
City Project Number: 0751 Bids Open: 5/3/2012 2:00 PM Engineer's Estimate: $27,800,000.00 Contractor License Required: A Cost of Plans and Specifications: $400.00 Technical Contact: See project description
Apparent Low Bidder: C. Overaa & Co. Council Award Date: 6/12/2012
The work consists, in general, of: clearing and grubbing, removing existing facilities, relocating a wood-framed stucco-finished fence, earthwork, grinding, constructing curb, gutter, and sidewalk, placing hot mix asphalt, installing storm drain catch basins and storm drain pipe.
City Project Number: 11-46 Bids Open: 4/18/2012 2:00 PM Engineer's Estimate: $162,000.00 Contractor License Required: A Cost of Plans and Specifications: $55.00 Technical Contact: Nathan Bray, PE
Apparent Low Bidder: Taylor Backhoe Services, Inc. Council Award Date: 5/8/2012
The project consists of the following:
1) Junction Structure
2) 48” Pump Station Influent Gravity Pipeline
3) Pump Station. (Cast in place wetwell, four vertical turbine pumps, prefabricated metal
building, site work, and all other appurtenances).
4) Outfall Pipeline. (Approximately Steel Pipe or Ductile Iron Pipe - nominal diameter 36”).
5) Standpipe
6) 48” Gravity Pipeline to Outfall Structure
7) San Joaquin River Outfall Structure
Bidders are required to complete Document 00451, Construction Contractor's Qualification Statement, attached to the Bid Form.
For procedural questions contact:
Stephen Fremming
City of Turlock, Development Services, Engineering Division
(209) 668-5599 ext. 4417
SFremming@turlock.ca.us
Submit all technical questions during the bid period in writing (via email) to the first and second contacts listed below:
Darren Baune (first contact)
Carollo Engineers, P.C. – Walnut Creek Office
(925) 932-1710, fax (925) 930-0203
dbaune@carollo.com
Michael Hartlaub, (second contact)
Carollo Engineers, P.C. – Walnut Creek Office
(925) 932-1710, fax (925) 930-0203
mhartlaub@carollo.com
The Contract Documents Consist of 4 volumes:
Volume 1 - Drawings
Volume 2 - Specifications (Divisions 0 through 9)
Volume 3 - Specifications (Divisions 10 through 17)
Volume 4 - Permits
Volumes 2, 3, and 4 are combined into a single PDF file if downloaded from the City's website. These volumes are bounded separately if hard copies are purchased.
A MANDATORY pre-Bid conference will be held at 10:00 am on January 11, 2012 at Turlock Regional Water Quality Control Facility Administration Building, 901 South Walnut Road, Turlock, CA.
City Project Number: 6859 Bids Open: 2/23/2012 2:00 PM Engineer's Estimate: $20,800,000.00 Contractor License Required: A Cost of Plans and Specifications: $135.00 Technical Contact: See project description for contact instructions
Apparent Low Bidder: Sierra Mountain Construction, Inc. Council Award Date: 3/27/2012